Progress on Beaver Creek Road ERBR-79(04), Wilkinson County, MS
JKS was hired for the designing, surveying and the construction engineering & inspection for the replacement of Bridge SA79-082. The existing timber bridge will be replaced with a concrete poured in place bridge. The roadway length is 0.146 mile (773.7 feet) and bridge length is 0.042 mile (222 feet) totaling 0.188 mile for the project.
August 2021
June 2021
May 2021
April 2021
March 2021
January 2021
January 5, 2021 Vertical Piles and Batter Piles being installed
December 22, 2020 Piles